WELDED BLOCK PLATE HEAT EXCHANGERSProcess heating · Cooling · Condensation · Heat recovery
COMPABLOC REPLACEMENT

Compabloc CP75 Core & Complete-Unit Replacement

Define the replacement scope for your installed Compabloc CP75 before specifying a PANSTAR solution. Assess the existing casing and core interfaces for core-only work, or compare a complete HEXCBLOC 75 installation against the actual site constraints.

ParameterALFA LAVAL
Compabloc CP75
PANSTAR
HEXCBLOC 75
Maximum width1,240 mm1,240 mm
Maximum height3,300 mm3,600 mm
Published design pressureASME maximum: 38 barStandard: full vacuum to 32 bar
Published temperature range−46 °C → 343 °C−40 °C → 300 °C
ConstructionWelded plate pack; removable panelsWelded plate pack; removable panels
Core / plate packCompabloc CP75Replacement core available following drawing and configuration review

Published reference dimensions and ratings describe standard ranges. Verify the actual installed unit nameplate and drawing. Plate count, materials, nozzles and baffles determine the supplied configuration; the references do not establish interchangeability.

CP75 Replacement Scope

A welded-core replacement keeps only the casing components approved for reuse. A complete-unit replacement changes the exchanger assembly and may require piping or support work. Evaluate retained casing condition before selecting either path; a damaged sealing surface or distorted interface can change the proposed scope.

The comparison table contains published range references, rather than a surveyed installation drawing. Its CP75 and HEXCBLOC 75 maximum-height entries differ. Check actual exchanger height, lifting route and overhead space; do not treat the listed width as proof of fit.

Core Replacement Interface Review

Start with the CP75 core envelope and available plate-pack drawing. Record plate count, plate pattern / formed geometry and heat-transfer area where documented, together with channel and baffle arrangement. Establish which circuit connects to each header and nozzle; apparent dimensional similarity does not establish equivalent flow paths.

Check header connections, panel / seal interfaces, internal supports, bolt and cover geometry against retained casing measurements. Inspect components proposed for reuse and establish the material and design basis for the rebuilt assembly. Use Plate Pack Replacement Engineering for the full inspection methodology and document requirements.

Complete Unit Fit Review

Survey footprint, overall height, support points and nozzle centre lines. Compare connection sizes, orientation and flange standard with the proposed GA drawing. Identify existing piping restrictions, foundation changes, panel-removal clearance and the lifting path before a shutdown plan is fixed.

Review thermal and hydraulic conditions independently of installation fit: both fluids, flow range, temperatures, phase change, allowable pressure losses, fouling and design conditions. Changed production conditions require a new duty basis. State any installation modifications and responsibilities in the assessed scope.

Existing CP75 Project Record

PANSTAR maintains a separate CP75 project record describing the confirmed replacement scope available for public reference. The record concerns welded-core / plate-pack replacement in petrochemical service.

That record does not establish compatibility for every CP75. Project-specific material grade, internal dimensions, thermal duty, inspection results and measured operating performance are not published. Your installed unit needs its own drawing, condition and duty review; the project photograph cannot substitute for those checks.

What PANSTAR Needs for CP75 Assessment

  • Equipment identity: CP75 model designation, nameplate and serial number if available; GA drawing, original datasheet and site photographs.
  • Operating case: hot and cold fluid compositions, flow rates, inlet and required outlet temperatures, operating pressures and allowable pressure drop on both circuits.
  • Construction records: design pressure / temperature, plate alloy, known panel and seal materials, plate count / area and available core or baffle drawings.
  • Site and condition evidence: actual overall and internal dimensions, nozzle sizes / positions, support arrangement, access restrictions and the current problem or reason for replacement.

Begin with the information you have; a complete archive is not required for the first contact. Mark unavailable records and tell PANSTAR whether core-only work or a complete exchanger is the preferred starting scope.

CP75 Assessment Checkpoints

Confirm the duty basis, core or complete-unit fit, nozzle alignment, pressure-boundary assessment and material compatibility. Record the disposition of retained components, support changes, service clearances and outstanding documentation. Compatibility is confirmed case by case after the relevant review, rather than inferred from the model or the separate project record.

Alfa Laval Compabloc · 200000002-1-EN-GB · HEXCBLOC 75 · Published specifications

Alfa Laval and Compabloc identify the original equipment. HEXCBLOC is supplied by PANSTAR.

Compare another Compabloc model

Send Your CP75 Nameplate & Drawings

Send the available nameplate, datasheet, drawings and photographs. State the current problem and preferred replacement scope; PANSTAR will review the information needed for the next assessment step.

Request CP75 Replacement Assessment